Sod spec builder
Pick the options and get a numbered sodding section you can copy or print. It starts from the sample spec text on our specs page, which follows Turfgrass Producers International's guideline specifications, Texas A&M AgriLife, and the TxDOT and ODOT standard specifications. It runs in this browser; nothing is sent.
Your spec section
Pricing a specified job
Send the area, address, date, and format. A partner grower quotes it. Soddesk does not set the price.
Sources
- Turfgrass Producers International, “Guideline Specifications to Turfgrass Sodding,” revised 2006: 24-hour harvest-to-install, 0.60 ± 0.25 inch cut, 3:1 slope securing, 12-hour installation acceptance, 30-day maintenance, 30% mowing rule. Read from a copy of the 2006 revision; confirm its current position with TPI.
- Texas A&M AgriLife Extension, How to Select and Install Sod (SCSC-PU-125) — best within 36 hours of harvest.
- Texas A&M AgriLife Extension, Turfgrass Establishment for Texas (SCSC-PU-079) — certified sod; amendments in the top 4 to 6 inches; firm surface free of footprints, stones, depressions, and mounds; irrigation heads 1/2 to 3/4 inch above grade for sod; sod heating.
- Oklahoma State University Extension, Establishing a Lawn in Oklahoma (HLA-6419) — never sod into dry soil.
- TxDOT, 2024 Standard Specifications, Items 160–169.
- ODOT, 2019 Standard Specifications, Sections 230, 233, 234, 241 and 735.01.
Every option and clause comes from the specs page and the sources above. Bracketed text [like this] is a choice or blank for the specifier.